Halle Perret, Montataire
An industrial hall by the Perret brothers is going through transformation and renovation in order to host the music and dance school along a performance hall and music recording studios. TransEuropArchi 2019 Award.
Technische Details
Renovierungen/Umbauten Halle Perret.
Ort Montataire, France.
Baukosten 4.2 million €.
Zeitrahmen Competition: 2013. Design: 2016-2017. Building Phase: 2017-2018. Opening: April 2018.
Bauherr City of Montataire.
Architekt(en) Atelier d'Architecture Pierre Hebbelinck, Belgium www.pierrehebbelinck.net • Hart Berteloot Atelier Architecture Territoire (HBAAT), France hbaat.fr
Theaterplaner ArtSceno, Switzerland artsceno.ch
Zahl der Sitzplätze The music and dance school comprises eight classrooms, two collective practice rooms for music and dance (800 m²). The space also includes a recording studio, and rehearsal studios. Total area 2 276 m².
Nutzung The town hall association in charge of music education shares the space with Pôle Musiques actuelles Mont' le Son that comprises three rehearsal studios and a recording studio.
Leistungsumfang Comprehensive acoustic consulting services including acoustic concept, design and construction supervision.
Beteiligte Berater Yann Jurkiewicz, Émilie Carayol, Kahle Acoustics.